Sign In | Join Free | My enlightcorp.com
China Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. logo
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. Modesty,Sincerity,To Be Excellent
Active Member

7 Years

Home > Pile Foundation Equipment >

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
Contact Now

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

  • 1
  • 2

Brand Name : T-works

Model Number : ZYC280

Certification : CE,GOST

Place of Origin : HUNAN,CHINA

MOQ : 1 unit

Price : Negotiable

Payment Terms : L/C, T/T, D/P, Western Union

Supply Ability : 15 units per month

Delivery Time : 30-45 days after deposit received

Packaging Details : Nude package for main body, plastic package for key parts

Product Name : Hydraulic Static Pile Driver

Max driving force(KN) : 2800

Rated Piling Pressure(KN) : 2800

Piling Stroke(m) : 1.8

Piling Speed(m/min) : 7.2

Total weight : With counterweight total 280Ton

Rise stroke(m) : 1

Piling engine(KW) : 60

Contact Now

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

1. Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.

2. Applications:

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

3. Specifications:

Parameter/Model ZYC280
Rate piling pressure(KN) 2800
Piling speed(m/min) Fast 7.7
Low 1.8
Piling stroke(m) 1.9
Pace(m) Longitudinal 2.4
Horizontal 0.6
Angle range(°) 15
Rise stroke(m) 1.0
Square pile(mm) Max 500
Circle pile(mm) Max 500
Side piling(mm) 900
Corner piling space(mm) 1800
Lifting weight(t) 12
Pile hanging length(m) 14
Power(KW) Piling 60
Lifting 30
Main dimension(m) Work length 12
Work width 6.1
Transpot height 3.1
Total weight(t) 280

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.

3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.

4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.

5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality


Product Tags:

pile foundation machine

      

foundation drilling machine

      
Quality Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality for sale

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)